Content3rd to 13th
Distortion at multiples of 50/60 Hz adds current that does no work. It turns to heat in your cables, motors and transformers.
The same output on 10–20% fewer kWh, proven at your own meter.
Site load, now
780 kW
The whole site, at the meter
HarmoniQ saving
0 kW
Switch HarmoniQ on to see it
On this site, a year
$86,415
off a $576,100 energy spend
HarmoniQ off The whole site's electricity, as the meter sees it, second by second
Energy at the meter
100%
For the same working day
Saved since switch-on
0 kWh
$0 off the energy line so far
On this site, a year
$86,415
off a $576,100 energy spend
HarmoniQ off Every line is one day at your meter, and you pay for all of it
At the meter100%What you pay for
Waste · 15%Heat in cables, motors and transformers
Your equipment85%The same output
HarmoniQ off 15% of the energy drawn is wasted as heat before it does any work
HarmoniQ off Drive harmonics at the 5th, 7th, 11th and 13th, triplens from single-phase loads, phases out of balance
Clean power enters your facility at 50/60 Hz. By the time it reaches your equipment, harmonic distortion, reactive power and unbalance have turned up to 20% of it into waste heat — and you're billed for every watt.
Content3rd to 13th
Distortion at multiples of 50/60 Hz adds current that does no work. It turns to heat in your cables, motors and transformers.
Power factor0.85
Current that does no work but still has to be supplied. It inflates apparent power, capacity charges and power-factor penalties.
Current imbalance · one board25%
Single-phase loads pull the three phases off their marks, the dotted arrows. The difference flows down the neutral (N) and sets up counter-rotating fields in motors: heat without torque.
Hover over an instrument to see it corrected
Where all three end up: a switchboard through a thermal cameraDistortion starts at your equipment and spreads through every feeder, busbar and transformer to the meter. HarmoniQ stops it where it starts, so the same machines draw less power.
Swipe the diagram to see the whole network
No saving is modelled for an alternative: its correction stops at the main board, and everything behind it carries the same current.
Where the energy goesDrawn at the meter 100%
Wherever the load is AC motors, compressors, pumps and fans, there is waste to stop.
Only the first of these is energy. The other two are charges that fall away with it — which is why the total can exceed the energy saving.
Commercial energy invoice
Monthly · industrial account
Switch to “With HarmoniQ” to see the same month corrected
Representative commercial bill for a 2 MW industrial facility. Actual savings vary by site.
10–20%
Energy · kWh
Fewer kilowatt-hours for the same output. Wasted current stops being converted to heat, so the meter records less. This is the figure our performance guarantee is written against.
Eliminated
Power-factor penalties
Power factor is corrected to 0.98 or better across the network, so reactive-power penalty charges fall away entirely where your utility levies them.
Reduced
Capacity charges
Correction frees apparent power, letting a site lower its agreed capacity instead of paying for headroom it never uses.
Up to 25% off your total electricity bill.
Typically 10–20%, and about 25% where all three lines apply. Quoted against your invoices; guaranteed against normalised consumption.
Estimate your own siteLess heat, longer life. Reducing operating temperature by up to 20 °C extends motor and transformer lifespan by 2–4×, so the assets you already own last longer and cost less to keep.
Insulation life
2.83×
Running cooler by
15 °C
We quantify the opportunity on your site with zero disruption. Every installation is backed by a minimum performance guarantee — if the equipment doesn't deliver the agreed savings, you don't pay.